Which of the following organizations from cooperative sector have surpassed the ₹1 lakh crore annual turnover mark for the first time in FY 2025–26?
Which of the following organizations from cooperative sector have surpassed the ₹1 lakh crore annual turnover mark for the first time in FY 2025–26?
निम्नलिखित में से किस सहकारी क्षेत्र के संगठनों ने वित्त वर्ष 2025–26 में पहली बार ₹1 लाख करोड़ वार्षिक टर्नओवर को पार किया?
Detailed Solution & Logic
B. Saraswat Cooperative Bank and Amul (GCMMF)
Answer: B. Saraswat Cooperative Bank and Amul (GCMMF)
Explanation: In FY 2025–26, both Saraswat Cooperative Bank and Amul crossed the ₹1 lakh crore turnover mark for the first time, highlighting the growing strength of India’s cooperative sector. वित्त वर्ष 2025–26 में, Saraswat Cooperative Bank और Amul दोनों ने पहली बार ₹1 लाख करोड़ टर्नओवर पार किया, जो भारत के सहकारी क्षेत्र की बढ़ती ताकत को दर्शाता है।
Similar Practice Questions
Who won the Women’s Kabaddi World Cup 2025 held in November in Dhaka Bangladesh?
Who won the Women’s Kabaddi World Cup 2025 held in November in Dhaka, Bangladesh? नवंबर...
According to the United Nations Conference on Trade and Development (UNCTAD) report, which country became the world’s top ship recycling nation in 2025?
According to the United Nations Conference on Trade and Development (UNCTAD) report, which country became...
Who was sworn in as the 53rd Chief Justice of India on 24 November 2025?
Who was sworn in as the 53rd Chief Justice of India on 24 November 2025?...
Bharat Taxi, launched in June 2026, is India’s first:
Bharat Taxi, launched in June 2026, is India’s first: जून 2026 में लॉन्च की गई...
Where was the 20th G20 Leaders’ Summit 2025 held in November 2025?
Where was the 20th G20 Leaders’ Summit 2025 held in November 2025? नवंबर 2025 में...
Which Indian space start-up launched Mission Drishti, the world’s first OptoSAR satellite, in May 2026?
Which Indian space start-up launched Mission Drishti, the world’s first OptoSAR satellite, in May 2026?...
The Delhi–Varanasi Bullet Train Project, announced in the Union Budget 2026–27, will have a maximum design speed of:
The Delhi–Varanasi Bullet Train Project, announced in the Union Budget 2026–27, will have a maximum...