The new Parliament building was inaugurated by the Prime Minister.

  • On 28 May, 2023, Prime Minister Narendra Modi officially inaugurated the new Parliament House.
  • The New Parliament House in the Central Vista area of New Delhi is designed to accommodate the growing size and needs of the Indian Parliament.
  • The building has seating arrangements for 888 members of the Lok Sabha and 384 members of the Rajya Sabha.
  • It features 6 committee rooms equipped with state-of-the-art audio-visual systems.
  • The building covers an area of approximately 65,000 square meters and has a triangular shape to optimize space utilization.
  • It is a four-storied building constructed at an estimated cost of Rs 970 crore.
  • The design of the building was done by Ahmedabad-based HCP Design, Planning and Management. The construction was carried out by Tata Projects Limited.
  • Prime Minister Narendra Modi also installed “Sengol” in a dedicated enclosure to the right of the Speaker’s chair in the Lok Sabha chamber.

Qns : Which company carried out the construction of the new Parliament House?

(A) Reliance Infrastructure Ltd.
(B) Sadbhav Engineering Ltd.
(C) Tata Projects Ltd.
(D) Dilip Buildcon Ltd.

Ans : (C) Tata Projects Ltd.

Scroll to Top